Skip to main content

Lali Properties

Jaipur property guide · Updated November 2026

Jaipur Metro Phase 2 and Your Property

The approved Orange Line will run 41 km from Prahladpura to Todi Mod. Here is what it means, stretch by stretch, for buying, selling and renting in Jaipur.

Since 2018800+ transactions assistedBased in C Scheme
Representative image
41 km
North–south corridor
36
Stations planned
₹13,038 Cr
Sanctioned cost
12 km
First stretch under way
Sep 2031
Completion target

Official figures from the Union Cabinet approval of April 2026. Some trade reports quote a design length of about 42.8 km.

An introduction

A second metro line, and a new property map

For years, Jaipur’s metro meant one short line from Mansarovar to Badi Chaupar. Phase 2 changes that. Approved by the Union Cabinet in April 2026, it adds a north–south spine through Sitapura, Tonk Road, the airport, SMS Hospital, Ambabari and Vidhyadhar Nagar. For anyone who owns, is buying or is renting out property in Jaipur, it is the most important infrastructure decision of the decade. This is our plain guide to what it does and does not change.

01 · Timeline

Where the project stands

From approval to the first construction contract in a few months, after years of revisions.

WhenWhat happened
Apr 2026Union Cabinet approves Phase 2: 41 km, 36 stations, ₹13,037.66 crore, built by Rajasthan Metro Rail Corporation (RMRCL), a 50:50 Centre–State joint venture.
May–Jun 2026First construction package awarded, as reported: a 12 km elevated stretch from Prahladpura to Pinjrapol Gaushala with 10 stations and a depot link.
4 Jul 2026Foundation stone laid by the Prime Minister.
From late 2026Civil works on the southern priority stretch.
Sep 2031Official target for the full corridor.

Today’s Pink Line runs 11.64 km with 11 stations and carries around 60,000 passengers a day. Phase 2 will connect to it through planned interchanges; Chandpole has been reported as the interchange station.

02 · Stretch by stretch

What it means for each part of the city

The metro does not lift the whole city equally. Here is how we read each stretch, from south to north. Station names beyond the first package are not yet officially notified, so treat locations as indicative.

Stretch 1 · South

Prahladpura to Pinjrapol Gaushala

Goner Mod, Sitapura, JECC, Kumbha Marg, Haldighati Gate (as reported)
Construction first
What changes

The industrial and institutional belt of Sitapura gets rail access first, which widens the area where workers and students can live without a car.

Our view

The strongest near-term case, because it is funded and contracted. Watch rental demand for mid-size homes nearby. See Sitapura and Pratap Nagar.

Stretch 2 · Tonk Road

Tonk Road, Durgapura and the airport

Underground stations planned in the airport area
What changes

Jaipur’s first direct rail link between the airport and the city core, along its busiest southern road.

Our view

Good for offices, showrooms, hotels and clinics on Tonk Road. Homes in Malviya Nagar and Durgapura gain convenience, but expect years of diversions during construction.

Stretch 3 · Centre

SMS Hospital to Chandpole

SMS Hospital and Stadium, the Collectorate and railway belt
What changes

More footfall into an area that is already Jaipur’s most valuable and has almost no land left to build on.

Our view

Expect support for retail and commercial rents rather than a jump in land prices. Prestige areas like C Scheme gain a station at their edge.

Stretch 4 · North

Ambabari, Vidhyadhar Nagar, VKIA, Todi Mod

North-west Jaipur and the Sikar Road corridor
What changes

The part of the city with the least public transport today gets the biggest relative improvement.

Our view

The largest long-term upside, but the longest wait and the most execution risk. Best for patient buyers. See Sikar Road.

03 · The 800 m rule

Why distance to the station matters most

Rajasthan’s Transit Oriented Development (TOD) policy treats land within about 800 metres of a transit station as a TOD zone, with the most intense development planned within about 500 metres. In December 2025, the JDA marked five road stretches along the existing Pink Line, including Janpath, ESI Road and Tonk Road, as TOD corridors, opening them to mixed use and higher building potential.

Phase 2 is formally aligned with the same policy. In practice, that means the value of a plot or building near a future station depends less on the line and more on its exact distance from the entrance, the road width, and what the TOD rules finally allow on that specific plot.

04 · What to do

How to act on it

BuyersPay for today’s value, not the 2031 promise. Within 800 m of a confirmed station, a small premium can be fair. Beyond that, be wary of “metro-facing” pricing.
SellersIf your property is close to a confirmed station, buyers will ask about it. Get a valuation that reflects recent nearby sales, and present the station distance clearly.
LandlordsConstruction years can soften rents on the busiest roads. Once stations open, homes within walking distance usually rent faster to working tenants and students.
BusinessesGround-floor retail, clinics and offices near future stations gain footfall. Long leases signed now can lock in today’s rents. See our commercial leasing desk.
05 · Both sides

The upside, and the honest risks

The upsideA funded project with a central and state government joint venture behind it, a contractor already appointed for the first stretch, a direct airport link, and a TOD policy that can raise what is allowed on nearby land.
The risksTimelines slip: Phase 2 itself took many years of revisions before approval. Final station locations and names are not fully notified. Sellers often price the metro in early. And roads along the route will face years of construction disruption.
06 · Checklist

Before you buy near a future station

The checks we run for clients considering a metro-linked purchase.

01
Confirm the station

Check the station’s location in RMRCL or JDA documents, not a brochure map. Measure walking distance to the likely entrance.

02
Check TOD status

Ask whether the plot falls inside a notified TOD zone, and what that allows on its road width.

03
Price without the metro

Compare recent sales of similar properties away from the line. The difference is the premium you are paying.

04
Plan for the build years

Expect dust, diversions and access issues until the station opens. Check your holding period fits.

05
Verify title and approvals

The metro does not fix a weak title. Check the patta type and building approvals as usual.

06
Know the full cost

Budget for stamp duty and registration on the DLC value or price, whichever is higher. See our registry cost guide.

07 · FAQs

Frequently asked questions

What is Jaipur Metro Phase 2?

It is a new north–south metro line, often called the Orange Line, from Prahladpura in the south to Todi Mod in the north. The Union Cabinet approved it in April 2026: 41 km, 36 stations and a cost of ₹13,037.66 crore.

When will Jaipur Metro Phase 2 be completed?

The official target for the full corridor is September 2031. The southern stretch from Prahladpura to Pinjrapol Gaushala is being built first.

Which areas will the Orange Line connect?

Officially, Sitapura Industrial Area, Tonk Road, Jaipur Airport, SMS Hospital and Stadium, Ambabari, Vidhyadhar Nagar and VKIA, with underground stations in the airport area.

Will the metro increase property prices in Jaipur?

Usually only close to stations, and gradually. The effect tends to be strongest within about 800 metres of a station and after the station opens. No one can promise a specific percentage, and part of any premium is often priced in early.

Is it a good time to buy near the Phase 2 route?

It can be, if the price makes sense without the metro, the station location is confirmed, and your holding period comfortably covers the construction years.

What is a TOD zone in Jaipur?

Under Rajasthan’s Transit Oriented Development policy, land within about 800 metres of a transit station can be designated for mixed use and denser development. The JDA has already marked TOD corridors along the existing Pink Line.

Where will Phase 2 meet the existing Pink Line?

The project will integrate with Phase 1 through planned interchanges. Chandpole has been reported as the interchange station.

Lali Properties · Jaipur · Since 2018

Own or eyeing property near the route?

Tell us the address or the area you’re considering, and we’ll give you an honest view of what the metro means for that specific property, not the city as a whole.

Sources: Cabinet approval of Jaipur Metro Phase 2, PM India (April 2026); first package and foundation stone as reported by GHAR.tv (July 2026); JDA TOD corridors as reported by PropNewsTime (December 2025). Facts checked November 2026. This guide is general information, not investment advice.

Leave a Reply

Your email address will not be published. Required fields are marked *